Power supply from the public grid and process steam via boiler system
Michelin tire plants, Bad Kreuznach, Germany
Goal
Energy-efficient supply of steam and electricity to the tire plants
Solution
Operational management by Iqony, renewal of energy generation
- Gas turbine with 10 MWel and waste heat boiler,
- takeover of the operating team
Results
- Investment: € 10 million
- Savings: 1 million €/a
- CO2 savings: 7.000 t/a
Impact
Energy saving, cost reduction, Integration of the old system
Project facts
| Generation |
|